Order Code: 19203351.14
Category: General Lab Equipment III
B. SPECIFICATION 1. Features: Four Digital Panel Meters Triple Output Auto Tracking Auto Series and Parallel Operation Constant Voltage and Constant Current Operation Low Ripple and Noise Inter...
B. SPECIFICATION
1. Features:
2. Technical specification:
C. ACCESSORIES
D. MANUAL This equipment must come with complete user's instruction manual in English.
E. INSTALLING AND COMMISIONING Installing and commissioning must be done within 1 month from the date of delivery at no additional cost from institution. All installation and commissioning should be completed before training at site can be conducted.
F. TRAINING Duration: minimum 1 days. No. of participant: minimum 5 persons nominated by the institution. Objective: - The trainee must be able to operate and run all the equipment and experiments. Training at site should be different date from the installation and commissioning of the equipment
G. WARRANTY At least 2 year inclusive of parts and labor /after sales service from the date of successful completion of Installation and commissioning and handling over.