Runnable APU Training Set

Order Code: APU-100A

Category: Powerplant Systems

Trainees can learn basic components and systems in a gas turbine engine with APU-100A Runnable APU Training Set. They can operate a gas turbine engine with the training set after learning on operational procedures. Training set include...



SPECIFICATION

Trainees can learn basic components and systems in a gas turbine engine with APU-100A Runnable APU Training Set. They can operate a gas turbine engine with the training set after learning on operational procedures. Training set includes all the systems that is on a gas turbine engine.

Specifications

  • Delivered ready for build-up and runnable applications
  • Instrument panel( Analog or Digital )
  • Fuel-system components/fuel pump
  • Oil tank
  • Fuel tank
  • Ignition harness
  • Starter
  • Electrical system
  • Engine-to-instrument console, with umbilical cord for safety
  • Mounted on easy-to-roll work stands

 

Engine Specifications

  • Power Output: 50 BHP (Air delivery)
  • RPM: 51,275 (100%) Idle 44,350 (86.5%)
  • Compressor: Centrifugal Impeller
  • Combustion Chamber: Reverse Flow Annular with 8 Burners
  • Turbine: 2 Stage Axial Flow
  • Layout: Single Spool with Reduction Gearbox
  • Starting: Starter Motor with Integral Speed Sensor
  • Ignition: HT Igniters with 2 Plugs
  • Fuel System: Electric Motor Driven Gear Pump with Electronic Control System
  • Lubrication: Dry Sump with Electric Driven Pump, Oil Spec MIl-L-7808
  • Air delivery: 0.415 Kg/Sec @ 45 PSI
  • Application: Air Producer in BAE Hawk (047), Ditto Jaguar(007), L39, Various French Aircraft

Enquiry Form