Plant Growth Chamber

Order Code: 22235755.3

Category: General Lab Equipment II

Technical Specifications: Material: Steel Cabinet: approx. 1.0mm thickness high quality cold-rolled steel sheet, the surface is packetized by acid and electro-sprayed by epoxy resin powder Dimension: Variable form 1 to 3 cylinders D...



SPECIFICATION

  1. Technical Specifications:
    1. Material: Steel
    2. Cabinet: approx. 1.0mm thickness high quality cold-rolled steel sheet, the surface is packetized by acid and electro-sprayed by epoxy resin powder
    3. Dimension: Variable form 1 to 3 cylinders
    4. Door panel: Detachable hinges, with tempered explosion-proof glass windows
    5. Pass hole: On the top side of body, to ensure the fresh air flow inside
    6. Fixed chain: fixed chain inside to prevent cylinder dump
    7. Footboard: Adjustable pedal on the bottom, in order to assemble and disassemble gas cylinder conveniently
    8. Alarm: device can identify combustible gas (such as methane, acetylene, gas, hydrogen, etc.), using special combustible gas detectors air diffusion sampling
    9. Automatic exhaust system: The sensor of gas leakage which detects and alerts the exhaust fun on the top of cabinet to automatically works and pump the gas outside the cabinet by though the pipe to ensure the  working zone workers secure.
  2. Manuals:
    1. Operators handbook in English and Portuguese
    2. Parts catalogue, either hard copy or cd rom
    3. The cost of all manuals must be included in the DAP price
  3. Spare Parts:
    1. A list of manufacturer’s recommended, spare parts sufficient for 3 years of operation must be submitted. The list must be individually itemized, customized, costed and submitted with bids. 
  4. Inspection-installation:
    1. the Supplier must undertake final assembly and pre-delivery inspection (PDI), plus basic training on the operation and maintenance of the machine before handover to the end users.
    2. The Supplier shall provide required technical assistance in running the equipments at least for one season and provide guidance to the local staff in operation and maintenance of the equipments supplied.
    3. The cost of undertaking final assembly, pre-delivery inspection plus basic training, must be included in the DAP price
  5. After Sales Service
    1. Supplier’s name, address, tel/fax number, e-mail address of service agents in neighbouring countries or in the region.

Enquiry Form