Freeze Thaw Chamber

Order Code: 22236239.1

Category: General Lab Equipment II

Freeze-Thaw Chamber The Contractor delivers a self-contained and fully automated concrete freeze-thaw chamber for use on various concrete specimens in accordance with the standards and guidelines of both procedures A and B of ASTM C666-15 Technic...



SPECIFICATION

Freeze-Thaw Chamber
The Contractor delivers a self-contained and fully automated concrete freeze-thaw chamber for use on various concrete specimens in accordance with the standards and guidelines of both procedures A and B of ASTM C666-15

Technical Specifications

Unit Specifications

  • Unit have self-contained and include a separate temperature-controlled thaw-water storage tank. Use water as the thaw medium
  • Fully automated and test in accordance with both procedures A and B of ASTM C666-15
  • Capacity for 60, 3” x 4” x 16” concrete specimens. The procurement also include 60 plastic freeze thaw sample container sleeves (3” x 4” x 16”) for use with procedure A
  • Footprint:10’ x 6’
  • Refrigeration system utilizes air cooled: 404A refrigerant and 208/60, 50 Amp, Three Phase
  • Circulating fans for uniform temperature distribution
  • Lid operated with an electric actuator
  • Type T thermocouples: 8 Channels

Controls

  • Touch screen interface
  • Programable control
  • Programable time and temperature profiles
  • Adjustable cycle times
  • Able to operate in automatic or manual modes
  • View over-all status of the machine including status of alarms and alarm history
  • Network connectivity
  • USB port
  • Data available in Excel format
  • An emergency stop button
  • Adjustable water set point
  • Real time data display on the machine interface

Other Specifications

  • Hard and digital copies of site preparation, Installation, Operating and Maintenance manuals in English. Electrical and program schematics included
  • All power cables (compatible with North American power grid and sockets), data communication cables, air and water fittings 
  • Spare parts to be included: Fuses; Switches; Bulbs
  • Onsite Service: Installation & Training: The Contractor shall perform system training while onsite for installation. Training and installation onsite work at CRREL up to one (1) day by a US Citizen with proper identification after a security check.
  • Equipment Warranty: 1-year warranty covering the hardware
     

Enquiry Form