Order Code: 24257859.23
Category: General Lab Equipment V
Scope of Supply: The vendor is required to supply the following items as a minimum: Air Compressors with Air Receiver: Displacement: 3 CFM Working Pressure: 7 kg/cm² (7 bar) Motor: 0.5 HP, 650 RPM, 2...
Scope of Supply:
The vendor is required to supply the following items as a minimum:
Air Compressors with Air Receiver:
Displacement: 3 CFM
Working Pressure: 7 kg/cm² (7 bar)
Motor: 0.5 HP, 650 RPM, 230V, 50Hz, 1-phase electric motor
Additional Features: 0-10 bar pressure gauge, shut-off valve, suitable hose, and end connector.
Filter, Regulator, and Lubricator (FRL) Unit:
Pressure Gauge: 10 bar
Quantity: 1 unit
Direction Control Valves:
Configurations and Quantities:
5/2-way lever operated: 4 units
5/2-way single solenoid operated: 2 units
5/2-way double solenoid operated: 2 units
5/3-way lever operated: 3 units
3/2-way roller operated valve: 1 unit
Size: ¼” BSP
Pressure Control Valves, One-Way Valves, Flow Control Valves, Shut-off Valves, OR Gate & AND Gate Shuttle Valves, Time Delay Valve, Quick Exhaust Valve:
Quantity: Minimum of 1 unit each, or sufficient quantity to execute the experiments.
Size: ¼” BSP
Note: The vendor must specify the type, specifications, and quantity of valves offered.
Cylinders:
Single Acting Cylinder:
Bore: 25mm
Stroke: 100mm
Mounting Arrangement: Suitable
Quantity: 1 unit
Double Acting Cylinder:
Bore: 25mm
Stroke: 100mm
Mounting Arrangement: Suitable
Quantity: 2 units
Pneumatic Motor:
Quantity: 1 unit
Pneumatic Hoses and Fittings:
Required Length and Quantity: Sufficient pneumatic hoses with suitable end fittings of quick snap type, and Ell, Straight & Tee fittings.
Spare Parts: 50% extra spares of hoses and fittings.
Details of Supply: To be specified in the offer.
Hand Tools:
Quantity: 2 sets (to be supplied)
Electrical Controls and Sockets:
Required Items: Electrical controls with sockets for solenoids, etc.
Details: To be specified and listed in the offer.
Other Required Items:
Any additional items required to carry out basic experiments and proposed for supply should be specified and listed in the offer.
Optional Items:
Any optional items that could improve performance or enable additional experiments should be specified and quoted as optional. These will be selected based on the requirement.
Documentation:
Quantity: 2 hard copies of the operation manual.
Installation, Demonstration, and Training:
Installation and demonstration, along with faculty training, will be provided within one month of the supply of the setup.
Additional Equipment:
Air Guns: 2 units of air guns with 15-meter pneumatic flexible pipes with compatible diameter.