Order Code: 22235809.6
Category: General Lab Equipment I
The system to have two inputs, one input to work as a master and the other input to work as auxiliary. The master input to be the main electricity grid and the auxiliary to be one of the Generators mentioned above. The system to have all needed power...
The system to have two inputs, one input to work as a master and the other input to work as auxiliary. The master input to be the main electricity grid and the auxiliary to be one of the Generators mentioned above. The system to have all needed power meters to monitor and measure the power coming from the master input, from the slave input and also the power supplied to the load. The system is to include all needed protection relays to protect the system at the switching time and also to protect the load. There should be the possibility to run the system manually and also automatically.