Order Code: 19203326.15
Category: General Lab Equipment III
B. SPESIFICATION Breadboard: Solderless Bread Board with 1680 inter connected tie points Pulse switches: 2 no’s. Bounce free push buttons Logic switches: 8 logic level switches in dip type Power supply: fixed...
B. SPESIFICATION
C. ACCESSORIES Connecting Leads (1 Full set) with other needed accessories.
D. MANUAL Operational Manual and Lab Workbook Instruction Manual: Three copies of detailed instruction manual with well thought out experiments covering the above topics.
E. INSTALLING AND COMMISIONING: Installing and commissioning must be done within 1 month from the date of delivery at no additional cost from institution. All installation and commissioning should be completed before training at site can be conducted.
F. TRAINING: Duration: minimum 2 day No. of participant: minimum 5 persons nominated by institution. Objective: - The trainee must be able to operate and run all the equipment and Experiment