Digital Multimeter

Order Code: 19203326.22

Category: General Lab Equipment III

 SPECIFICATIONS Multimeter Type – Handheld VoltAlert Technology for integrated non-contact voltage detection AutoVolt feature for automatic AC/DC voltage selection - Functions Measured AC Current, AC Voltage, Capacitance, Continu...



SPECIFICATION

 SPECIFICATIONS

  • Multimeter Type – Handheld
  • VoltAlert Technology for integrated non-contact voltage detection AutoVolt feature for automatic AC/DC voltage selection - Functions Measured
  • AC Current, AC Voltage, Capacitance, Continuity, DC Current, DC Voltage, Diode, Frequency, Resistance
  • Maximum Frequency
  • 1kHz -
  • Display Type – LCD
  • LoZ: Low input impedance to eliminate stray voltage
  • Large white LED backlight
  • True RMS
  • Min/Max/Average to record signal fluctuations
  • Current measurement 20A (30 seconds momentary 10A continuous)
  • Resistance, continuity, frequency and capacitance testing capability
  • Fluke 322 Compact Clamp Meter - Accurate low current measurements -
  • ToolPak Magnetic Meter Hanging Strap
  • 11A, 1000V FAST fuse
  • CAT III 600 V safety rated
  • Supplied with a carrying case.

 POWER REQUIREMENT

  • All required component such as battery needed to make the equipment fully operational must be supplied.
  • Absolute Maximum DC Current Measurement
  • 10A dc - Absolute Maximum AC Current Measurement
  • 10A ac - Absolute Maximum AC Current Measurement
  • 10A ac - Absolute Maximum Resistance Measurement
  • 40M - Absolute Maximum AC Voltage Measurement
  • 600V ac - Absolute Maximum DC Voltage Measurement
  • 600V dc - Absolute Maximum Capacitance Measurement - 9.
  • 999F - AC Current Measurement Resolution - 0.001A
  • DC Current Measurement Resolution
  • 0.001A - DC Voltage Measurement Resolution
  • 0.1mV dc - Resistance Measurement Resolution - 100m
  • AC Voltage Measurement Resolution - 0.1mV ac
  • Capacitance Measurement Resolution - 1nF

 MANUAL This device must come with complete user's Instructional and experimental in English
 INSTALLING AND COMMISIONING Installing and commissioning must be done within 1 month from the date of delivery at no additional cost from institution. All installation and commissioning should be completed before training at site can be conducted.

Enquiry Form