BOW TUNNEL THRUSTER T2 (S7)

Order Code: SL94824

Category: General Lab Equipment V

SLA BOW TUNNEL THRUSTER T2 (S7) LARSEN & TOUBRO LIMITED In: 3200 A IS 13947-2 Ue: 690 V-60 Hz IEC 60947-2 Icu: 85 kA Ics: 85 kA BS EN 60947-2 CE Icw: 100 kA for 1 s CN-CS 3200 H1 Utilization Category: B RACKING OUT OPERATION 1 Push a...



SPECIFICATION

SLA BOW TUNNEL THRUSTER T2
(S7)
LARSEN & TOUBRO LIMITED
In: 3200 A
IS 13947-2
Ue: 690 V-60 Hz
IEC 60947-2
Icu: 85 kA Ics: 85 kA
BS EN 60947-2
CE Icw: 100 kA for 1 s
CN-CS 3200 H1
Utilization Category: B
RACKING OUT OPERATION
1 Push and lock the racking interlock by turning it anti-clockwise before starting the "Racking Out" operation.
2. Remove the racking handle from the right hand side storage slot
3. Insert it into the slot given for racking.
4. Fold the racking handle at the two hinged points.
5 Start turning the handle anti-clockwise
6 Position indicator will change from "Service" to "Test" and then to "Isolated" as the breaker gets withdrawn.
7. After bringing the breaker into "Isolated" position, the compartment door can be opened.
8 The breaker can then be pulled out to "Maintenance" position, if required, with the help of the breaker operating handle
RACKING IN OPERATION
1 Release the breaker from "Isolated" position, if locked, by turning the key clockwise.
2 For "Racking in the breaker, follow the "Racking Out procedure in reverse direction
LONG TIME
SR21
 

Enquiry Form